Project Ohm: Year 2

The Ohm Project: Year 2


For the second year of the Ohm Project (9/20001-8/2002), we will reconfigure Ohm to use a ring-star hybrid topology. The following diagram depicts this topology, with the new network links shown in red, the 'master' nodes shown in light blue, and the 'server' nodes shown in dark blue:

Ring-Star Hybrid Topology
The particular ring topology shown is used to simplify the topological transition in year 3.

To implement this topology, two new network interface cards (NICs) will be added to each node, supplementing the NIC used in year 1. Each node's routing tables will also be reconfigured so that:

After collecting performance data in this configuration for six months, the cluster's topology will be altered to its year 3 (final) form.


Up to the
Ohm Home Page
Back to
Year 1
Forward to
Year 3